Project Summary
- Start date: 13 February 2023
- Completion date: 7th June 2023
Introduction
For Anderton Gables on behalf of Reside with Progress, Bambers Contractors Ltd successfully delivered the refurbishment and adaptation of an existing bungalow on Warbreck Drive, Blackpool, transforming it into a modern, safe, and accessible supported living unit.
The property was unoccupied during works, allowing for a comprehensive programme of internal and external improvements. The project was delivered by 100% Lancashire based staff and subcontractors, supporting local employment and investment in the regional economy.
Project Overview
Transforming a vacant bungalow into a safe, modern supported living environment
The project involved the full refurbishment and reconfiguration of an existing bungalow to meet the specific needs of supported living. Works included significant structural alterations, internal modernisation, and external accessibility improvements. Delivered within a tight 16 week programme and overcoming several logistical and environmental challenges, the scheme resulted in a high quality, future proofed home tailored to the occupant’s needs.
Project Details
Property Type
Existing bungalow (supported living adaptation)
Client
Reside with Progress (for Anderton Gables)
Scope
Full refurbishment, structural alterations, and accessibility adaptations
Occupancy
Unoccupied during works
Challenges
Overcoming Challenges
- Busy road location with a bus stop directly outside, restricting safe access and storage
- Tight 16 week programme with five bank holidays impacting productivity
- Mid project design changes requiring structural and external alterations
- Adverse weather conditions including Storms Otto and Noa, snow, and heavy rain
Solutions
How We Delivered
- Installed secure perimeter fencing to protect both the public and operatives
- Scheduled deliveries and waste removal around local bus timetables
- Deployed a floating workforce to recover lost time during bank holidays
- Continued structural works under verbal instruction while awaiting final drawings
- Reprogrammed external works in line with long range weather forecasts
Internal Refurbishment
Full refurbishment of the kitchen, lounge, staff bedroom, and bathroom to create modern, functional living spaces.
Structural Reconfiguration
Knocking down walls, relocating external doors, and redesigning layouts, including the removal of one bedroom to enlarge the kitchen.
Kitchen & Bathroom Enhancement
Creation of larger, more practical spaces, including a fully accessible wet room with cladded walls.
Fire & Safety Upgrades
Installation of FD30 fire doors, a new fire alarm system, and emergency lighting to meet safety standards.
External & Accessibility Works
Installation of ramps, driveway remodelling, landscaping, and full replacement of windows, doors, fascias, soffits, and gutters.
Mechanical & Electrical Upgrades
Complete M&E upgrades with full testing and commissioning to ensure compliance and performance.
Value Added
As a Company
- Additional weekend working ensured programme delivery despite constraints
- Use of programme software with live site reporting enabled proactive project management
- Identified structural insufficiencies in ceilings for future hoist installation, preventing future costs
- Worked collaboratively with the client to resolve design conflicts and deliver practical solutions
- Delivered comprehensive O&M manuals and a detailed home user guide
Public Impact
- Delivered a safe, high quality supported living unit tailored to an individual with learning difficulties
- Improved accessibility through ramps, wet room installation, and upgraded fire systems
- Created functional, modern living spaces to support daily needs
- Supported local employment and supply chains through a fully Lancashire based workforce
- Enhanced long term sustainability of housing stock in line with local authority objectives
Social Value
This project demonstrates Bambers’ commitment to delivering meaningful social value through local employment, community investment, and the creation of safe, accessible housing. By utilising a 100% Lancashire workforce and delivering a scheme tailored to individual needs, the project supports both economic growth and improved quality of life for residents.
Project Cost
Total Project Cost: £110,000
4 Months
Duration
£110,00
Total Cost